Low installed cost heat w elded seam s w hite reflective color and no liquid plasticizers.
Gaf tpo roofing installation instructions.
Pdf drill tec rhinobond attachment systems manual doc type.
Guide to assist architects engineers roofing contractors and owners in the use of our roofing systems.
Get automatic lifetime protection on your entire gaf roofing system when you install any gaf lifetime shingle and at least 3 qualifying gaf accessories you ll automatically get a lifetime limited warranty on your shingles and all qualifying gaf accessories.
Short for thermoplastic polyolefin tpo is a single ply roofing membrane that offers excellent performance at a cost effective price.
Roofing m em brane provides the benefits of all three m aterials in a single m em brane.
If retrofitting existing roofs with the gaf everguard tpo architectural profile power washing of the roofing membrane is recommended as a first step to remove dirt and debris.
Membrane installation 1 start at the low point of the roof and perpendicular to the slope 2 place roof membrane so that wrinkles and buckles are not formed.
Insulation boards installed in multiple layers must have the joints between boards staggered in all directions a minimum of 6 152 mm between layers.
1 install polyester or fibreglass separator sheet where required by roofstar guarantee standards.
Install insulation boards in pieces a minimum of 2 x 2 610 mm x 610 mm in size.
A guide to air barriers in commercial low slope roof assemblies doc type.
Gaf does not install roofing systems.
Tpo s long term heat uv and natural fungal resistance plus flexibility without need for plasticizers also make tpo a reliable low slope roofing system.
Heat welded seams provide superior strength.
Pdf chemical resistance guide tpo pvc doc type.
Pdf everguard metal retrofit supplement guide doc type.
Tpo pvc installation specifications 19.
Gaf does not own roof contracting companies or have any interest in companies installing.
After power washing allow the roof to dry and lay out the guide lines for profile installation.
Every piece must be properly secured to the substrate.